Seppi and Daddy have been working on cleaning out the basement in our spare minutes the last few weeks. This involves taking apart a bunch of bootleg shelves that the previous owner built.

We are taking a bit of time with it, because we don’t just want to rip it apart. We want to salvage the boards. This is complicated by the fact that all of the shelves, and the shelves that Uncle Adam built on top of the shelves, are held together with a random combination of nails and screws, and the screws have three different drivers: philips, T20 and T25.

Seppi did a lot of the unscrewing, but by the time we got around to these picture all of that was done, and he and Winnie were fighting over the nail-puller. Seppi gets annoyed by “little girls” interfering with man work, but he has to learn to let even the helpless females help sometimes.

Saturday morning before Thanksgiving week, well before sunrise, I got the last of the shelves taken apart on this side.

This will allow us to take the hard board off the ceiling to expose the wiring and trace them to see if we can find the circuit that burned the wire nut we discovered a few weeks ago.

After breakfast, we had more man work to do.

We had a plumber looking at the new addition, to give us an idea of our next steps. He mentioned that accessing the underside of the floor. The glulam beam that runs underneath the floor has about 4-6 inches of clearance above the dirt. The plumber requires 18-24 inches of clearance. He suggested taking up the floor.

It was a fairly cold morning, and when Seppi wasn’t digging he was out hunting for chunks of ice to show me.

In between hauling buckets of dirt out of the hole.
“Kraeger” is * German for badger, and not without reason.

Give a Kraeger a shovel, and he will move some dirt.

In the process, we uncovered a hole into which the dirt was sinking.

Turns out that was the old septic tank. Since it was a handy space under the crawlspace, we shifted as much of the dirt into it as we could.

Saved a few trips out of the hole to carry buckets. Although Daddy likes coming up to stretch his legs every once in a while.

The kids dumped the green bucket into the white buckets and the wheelbarrow.

Then Daddy carried the white buckets, while Seppi pushed the wheelbarrow.

And we dumped them on the new hugel bed where we took the tomatoes out a few weeks ago.

Annarose helped by bringing back the empty wheelbarrows.

And encouraging.
All told we spent about 5 hours there, clearing out enough space that Daddy could get under the glulam in two places, and could crawl straight to every point where the pipes would have to come through the floor.

And built almost 20 feet of hugel beds.

Adam was busy with cleaning out the upstairs rooms, but he finished that in the afternoon and came in clutch for the final hour of digging. It goes twice as fast if someone can be digging out underneath (Daddy) someone loading buckets (Edmund) and someone carrying the buckets to the garden (Adam). That was the only reason we got all the digging done in a single day, since we had to call it quits at 2 PM to go home and help Mommy and the girls prep for Lord’s Day supper.
*not